Skip to content

Choose which cookies this website uses. Your choice is saved on this browser for 12 months.

Necessary

These keep the site working and secure: a session cookie, a CSRF token that protects the quote and contact forms, and a cookie remembering this choice. Our CDN may also set cookies to deliver and protect the site. They cannot be switched off.

Always on
Analytics & embedded content

Read the Cookie Notice

Wider Cable
Get A Quote

Since 2005, we've been trusted worldwide for delivering premium yet affordable Ethernet and USB cables with exceptional service.

Flat A, 17/F., Wardley Center, 9-11 Prat Avenue, Tsim Sha Tsui, Kowloon, Hong Kong
+86 134 1273 3092 sales@widercable.com
Outdoor & PoE

Ethernet Built for the Environment It Lives In

"Extreme environment" is not a standard — a cold store, a wash-down food line and a coastal gantry destroy cable in three different ways. We build extreme environment Ethernet cable around the conditions you give us, and we never publish ratings we have not tested for your build.

  • Approach
    Built to brief

    No single part number pretending to cover every site.

  • In-house control
    Raw material to reel

    Compound, shield, conductor and termination chosen together.

"Extreme environment" is shorthand, not a specification. Buyers use it for any installation where the cable, rather than the switch, is the weak link — a cold store, a foundry gantry, a coastal site, a mine, a vehicle, a wash-down food line. Each of those destroys cable in a different way, so each needs a different construction. There is no single product that answers all of them, and a supplier offering one is really selling you a jacket colour.

We build to the environment instead. Wider Cable has manufactured Ethernet cable since 2005 with raw-material-to-finished control across our Dongguan and Hưng Yên facilities, and this is the work where that control matters most: the compound, the shield, the conductor gauge and the termination have to be chosen together, not picked off separate shelves.

The five ways an environment kills Ethernet cable

  • Temperature. Cold makes jackets stiff and brittle, so a cable that installs fine in summer cracks at the first hard frost. Heat works the other way — it ages the polymer and raises insertion loss, which shortens the usable run.
  • Chemicals and cleaning. Oils, solvents, wash-down detergents and airborne salt attack jacket compounds. A cable that survives a warehouse will not necessarily survive a daily caustic wash-down.
  • Moisture. Standing water in ducts, condensation cycling inside conduit, and capillary movement along the core all degrade performance long before anything looks wet from the outside.
  • Mechanical duty. Abrasion against a tray edge, crush under a pallet wheel, or continuous flex on a moving axis are three separate problems with three separate answers.
  • Electrical noise. Variable-speed drives, welders and large motors put energy into everything nearby. That is a shielding and bonding question, and it has to be answered at the construction stage.

Tell us the environment, not a part number

We can quote accurately from seven pieces of information. Sending them with the first enquiry usually saves a fortnight:

  1. Temperature range — the extremes the cable will actually see, not the annual average.
  2. Exposure — chemicals, oils, salt, UV, wash-down regime, dust or abrasive particulate.
  3. Mechanical duty — fixed installation, occasional movement, continuous flex, crush or impact risk.
  4. Installation method — tray, conduit, direct burial, aerial, or routed inside a machine.
  5. Electrical environment — nearby drives and motors, and the earthing and bonding scheme.
  6. Performance required — category, PoE budget, and the longest run in the system.
  7. Compliance — the certification or reaction-to-fire class the project specification calls for.

What we can confirm today

Across the Ethernet range we build shielding from U/UTP through U/FTP and F/UTP to S/FTP (SSTP), bare copper conductors, LSZH or PVC jackets, gold-plated RJ45 terminations, assembled lengths from 0.2 m to 25 m, and bulk to your reel length. Our outdoor line already runs a c(UL) CMX Outdoor / CMR jacket with F/UTP shielding, resistant to ultraviolet and cold — for many exterior sites that is the right starting construction, and development proceeds from there.

What we will not do is publish a temperature rating or a chemical-resistance table for a construction we have not built and tested for you. What we will do is propose a defined construction against your stated environment and back it with Fluke test results on the cable we actually ship.

How a project runs

  1. Requirement — you send the environment and performance brief above.
  2. Construction proposal — we come back with materials, shielding, conductor gauge and termination, and flag anything in the brief that pulls in two directions.
  3. Sample or first article — you test it in the real installation, not on a bench.
  4. Production — built across our China and Vietnam facilities.
  5. Test and documentation — Fluke results plus the certification your specification requires.

Certification

We hold UL, c(UL), ETL, CPR, RoHS, REACH, CE, SGS, ISO and TÜV, attached to the constructions that genuinely carry them. Where a project needs a certificate a proposed construction does not yet hold, we will say so at quotation rather than after the order.

Related: Outdoor Ethernet cables · Armored Ethernet cables · High-flex Ethernet cables · Custom cable service

Common questions

Do you have a standard extreme-environment part number?

No, and that is deliberate. The conditions differ too much between sites for one construction to be honest about covering them. We quote a defined build against a defined environment.

Can you match a construction we already buy?

Send the datasheet, or a sample. We reverse-engineer the construction, tell you what we can match exactly and what we would change, and quote on that basis.

Is there a minimum volume for a developed construction?

Tell us the volume you expect and we will tell you plainly whether development makes commercial sense at that scale — before you spend time on drawings.

How long does development take?

It depends entirely on the construction and on the test evidence you need. We give a schedule with the construction proposal, not before it.

Request a Quote

Describe the environment

Temperature range, exposure, mechanical duty, installation method and the performance you need. We reply with a construction proposal.

Send the specification and quantity — our sales engineers reply with construction options and pricing.